Our Custom Home Building Process

Transparency, precision, and in-house accountability at every stage.

Building a custom home is one of the most complex projects most people ever undertake. At Evergreene, we've refined our process over 40 years into something that reduces stress, eliminates surprises, and delivers a finished home that matches what you envisioned at the start, not a compromise version of it.

Phase 1: Discovery and Consultation

Every project starts with a conversation, not a pitch. We meet to understand what you’re building, why you’re building it, your timeline, and your budget. This is the most important meeting in the entire process because it determines whether we’re the right fit for each other.

We’ll ask about your architect, your land, your financing, and your priorities. You’ll ask about our experience, our process, and our team. At the end of a good discovery meeting, both sides know if there’s a project to pursue.

Phase 2: Preconstruction Planning

If we move forward, preconstruction is where the real work begins, before a single nail is driven. This phase includes:

  • Design development collaboration: we work alongside your architect to review plans for constructability, flag potential cost drivers, and suggest alternatives where appropriate
  • Detailed, itemized estimating: not a square-foot number pulled from a database, but an actual line-by-line bid based on your specific plans
  • HOA and DRC submission: we manage design review applications for communities that require them (Promontory, The Colony, etc.)
  • Permitting: we manage the permit process with the applicable municipality or county
  • Material specification and procurement: long-lead items (windows, doors, custom millwork, specialty stone) are ordered before construction begins

Phase 3: Construction

Construction begins when permits are in hand and materials are on order. Your project is managed by a dedicated project manager who is on-site regularly. Weekly progress updates with photos are standard. Budget tracking against the original bid is transparent, so you always know where you stand.

We build from your architect’s design, not a modified stock plan, so field decisions get checked against the original intent rather than improvised.

Phase 4: Finish Phase and Quality Control

The finish phase, trim, millwork, tile, paint, fixtures, is where a custom home reveals its true character. This is also where shortcuts most often appear in the work of less careful builders. We don’t rush this phase, and we don’t leave until it’s right.

Phase 5: Final Walkthrough and Move-In

Before we consider a project complete, we walk the finished home with you room by room. Every item on your punch list is documented and addressed. We don’t call it done until you call it done. After move-in, your project manager remains your point of contact for any questions or warranty items.

Why Our Process Works

Every phase of the Evergreene process depends on the same thing: building exactly what the architect designed, with the same project manager overseeing the job from first call to final walkthrough. 40 years in, and founder Chris Nielson still leads the company. That continuity shows in how a project is run.

The Evergreene Difference

40

40 Years in Business

Founded in 1987, with founder Chris Nielson still leading the company. That kind of longevity is rare in this market, and it means a build history clients and architects can check.

Fully Custom, Start to Finish

Most builders who call themselves custom adapt a handful of stock plan sets to a lot. Clients design from scratch with their architect, and we build it from scratch to match. No catalog, no shortcuts on the design intent.

Built for Complex, High-End Work

Architects and clients bring us the details other builders turn down. We've executed car lifts, walk-in wine fridges, and automated fixtures exactly as designed, with the craftsmanship to match.

How It Works

Our Building Process

A clear process is the foundation of a stress-free build. Here's what working with Evergreene looks like from first call to final walkthrough.

01

Initial Consultation

We meet on-site or at our office to understand your vision, timeline, and budget. No pressure, no pitch, just a real conversation about what you want to build.

02

Detailed Estimate & Planning

We produce a transparent, itemized estimate. You see exactly where every dollar goes. If we're working with an architect, we collaborate early to surface constructability issues before they become expensive surprises.

03

Permits & Pre-Construction

We manage the permitting process, material ordering, and scheduling, coordinating closely with your architect and the trades on the job so nothing stalls waiting on a phone call.

04

Construction

Our crews build. You get regular site updates, photo documentation, and direct access to your project manager, one point of contact for the life of the project.

05

Final Walkthrough

We walk the finished project with you, room by room. Every item on your punch list gets addressed before we call it done. That's been our standard for 40 years.

Common Questions

Frequently Asked Questions

For a typical custom home in Salt Lake City or Park City, you should plan for 18–30 months from initial consultation to move-in. This includes preconstruction (3–6 months), permitting (2–4 months), and construction (12–18 months). Mountain communities with DRC review (Promontory, The Colony) add 2–4 months to the preconstruction phase. We'll give you a project-specific timeline as part of your initial bid.